Las Vegas Monorail
Las Vegas monorail is a 2 track system opened in July 2004 to cover Las Vegas Strip.
- Known as: Monorail
- Lines: 1 , 2 tracks
- Stations: 7 (5 more are planned,2 of them at the airport)
- Passengers/day: 12,075
- Length: 6,3 km
- Average Speed: 80kms/h
- Owner and operator: Las Vegas Monorail Company
- Website: www.lvmonorail.com
- Opening: July 15, 2004
- Also known as: Kyoto Municipal Subway
- Lines: 2
- Stations: 32
- Length: 31,2 kms
- Max Speed: 90 kms/h
- Platform screen doors: Tozai Line
- Opening: 1981
- Website: http://www.city.kyoto.lg.jp
Probably Kobe might sound familiar to you because of the famous Kobe steaks that cost a pretty penny. If you visit them, you better move by underground and save some money for the bill in the restaurant
- Known as: Metro
- Lines: 2
- Stations: 28
- Network Length: 40,4 kms
- Operator: Kobe Municipal Transportation Bureau
- Opening: 1977
Barcelona Underground
- Known as: Metro
- Lines: 11
- Stations: 165
- Length: 123,5 kms
- Automated trains: Yes (from 2009)
- Web: www.tmb.cat
- Passengers/day: 1,127 millions
- Operator: Transportes Metropolitanos de Barcelona y Ferrocarriles de la Generalidad de Cataluña (TMB y FGC)
- Opening: 1924
Brasilia Metro
- Known as: Metrô
- Number of lines: 2
- Number of stations: 24
- Speed: 45km/h
- Operator: Metro-DF or Companhia do Metropolitano do Distrito Federal
- Passengers/day: 150000
- Website: www.metro.df.gov.br
- Start of operations: September 2001
Bilbao Subway
- Known as: Metro
- Length: 43 Kms
- Lines: 2
- Stations: 40 (24 underground and 16 in surface)
- Passengers/year: 89 millions
- Operator: Metro Bilbao S A
- Owner: Consorcio de transportes de Bizkaia
Cairo Underground, Egypt
Cairo underground was the first system built in Africa in 1987. It has 2 operational lines, another one under construction and 3 more planned.
- Known as:Metro
- Number of lines: 3, 2 operational and 1 under construction
- Number of stations: 57
- Length of the system: 65,5 Km
- Passengers/year: 600 millions
- Max Speed: 100km/h
- Website: www.cairometro.gov.eg
- Operator and owner:Egyptian Railway Authority
- Start of operations: September 27, 1987
lines, stations, maps, rates, frequency of almost all the undergrounds in the world